Skip to content
Skip house navigation

Load check

Explore the electrical demand behind your project.

Compare illustrative household-demand and EV-charging scenarios. These simplified tools help organize project questions; they cannot confirm capacity, specify a safe circuit, or establish code compliance.

Tool 1 of 2

Residential load estimate

What your house asks of the service on paper, in the shape of the optional method for an existing dwelling. Tick what you own, slide the square footage, and watch the amps. This is an estimate for a conversation, not the load calculation a permit needs.

Heated square footage

outside dimensions, every heated floor

2,000 sq ft6,000

Kitchen counter circuits

code minimum is two

2

Laundry circuit

a 20 A circuit for the washer

Fixed appliances

typical nameplate VA; tick what is electric

Heating and cooling

the larger of heat or cool counts, at 100%

Nominal tons of cooling

3 ton

EV charger

counted at 125% as a continuous load

Load estimate

105amps at 240 V

The smallest standard service with room for this is 150 A.

  1. 01General lighting, 3 VA per sq ft6,000 VA
  2. 02Counter and laundry circuits, 1,500 VA each4,500 VA
  3. 03Fixed appliances, nameplate25,400 VA
  4. 04First 10 kVA at 100%, remainder at 40%20,360 VA
  5. 05Heating or cooling, the larger, at 100%4,800 VA
  6. 06EV charger at 125%0 VA
  7. 07Total25,160 VA
100 Aover · 105%

Over 100 A on paper. A service change or a load-management device is the conversation.

150 Aroom · 70%

A 150 A service has room for this.

200 Aroom · 52%

A 200 A service has room for this.

Talk to us about the panel

An estimate, simplified from the NEC optional method. The permit calculation is done from your nameplates, and your local inspector (the AHJ) has the last word.

Tool 2 of 2

EV readiness check

The circuit a charger needs, whether it fits your service, and what the run costs. It uses the amps from the load estimate above, without the charger, so you are not counting it twice.

Existing service

the number on the main breaker

Charger you want

miles of range added per hour, roughly

Panel to parking spot

the wire run, not the walk

Two free spaces in the panel

a 2-pole breaker needs two, side by side

Use the load estimate above

105 A without a charger

Recommended circuit

60A breaker2-pole, 240 V

  1. 01Charger48 A at 240 V
  2. 02Wire6 AWG copper THHN in conduit; 4 AWG if it runs as NM cable
  3. 03Panel spaceA 2-pole breaker needs two adjacent free spaces. You have them, so no panel work beyond the breaker.

Fits the service

Your load estimate leaves about 95 A of headroom on 200 A. The charger adds 60 A on paper, so it fits.

Cost band

$1,100to$2,500

  • Charger circuit, breaker, and wall unit connection$800 to $1,800
  • Longer run and wire size$300 to $700
Estimate this charger circuit

Bands are for planning; the charger unit is not included. Wire sizes assume copper and the terminal ratings on the equipment. The written estimate is what counts.

How the math works

Understand the calculation assumptions

A qualified electrician must determine the applicable calculation method and assess the actual equipment, installation, and local requirements. Do not use this demonstration result to select or install electrical equipment.

  1. General lighting and receptaclesHeated square footage times three. That is the code’s number for lights and general receptacles.3 VA / sq ft
  2. Kitchen counter and laundry circuitsTwo counter circuits minimum, plus one for the laundry.1,500 VA each
  3. Fixed appliancesRange, oven, dryer, water heater, dishwasher, and the rest, at the VA on the label. We use typical numbers here; the permit calculation uses yours.nameplate
  4. Demand factorThe first 10 kVA of all that at 100%, the rest at 40%, because not everything runs at once.100% / 40%
  5. Heating or coolingThey do not run together, so the bigger one counts. We take it at 100%, which is more conservative than the code allows for some heat.larger at 100%
  6. EV chargerA charger runs for hours, so it is a continuous load and counts at 125% of its amperage, outside the demand factor.125%
  7. AmpsTotal VA divided by 240 gives amps on the service. We call it room at 80% of the rating or below.÷ 240 V

Discuss your electrical project