Bathroom remodeling

A bathroom remodel planned around who uses the room and when. Below is what the work covers and what sits outside it.

Finished bath: oak vanity with a stone top and widespread chrome faucet, a frameless glass shower with white subway tile and a tiled niche, and a white hex tile floor.

What it includes

In the scope

  • Review the shower, bath, vanity, and storage layout
  • Coordinate plumbing, ventilation, and lighting needs
  • Select surfaces, fixtures, and accessibility features
  • Plan waterproofing, inspections, and construction access

What stays outside this work

Not in the scope

  • Work not written into the bath scope is priced separately before it is done.
  • Water damage or plumbing problems found under the old fixtures are named and priced before they are added.

How this work is priced

Fixed labor. Named allowances. Change orders with a number.

  • Defined scope

    The proposal shows what is included apart from assumptions and upgrades, so you know what the bath price covers.

  • Material selections

    Your tile, fixtures, and vanity, and any allowances, are listed so the budget can be read line by line.

  • Approved changes

    Any change to the bath is written with its cost and the extra days the room is closed before you approve it.

Choices you make, and when they are due

The decisions, in the order they come.

  1. Project priorities

    Tell us who uses the bath and what makes it hard to use today.

  2. Scope and selections

    Approve the plumbing, ventilation, and lighting plan before the walls are opened.

  3. Scheduling and access

    Choose surfaces and fixtures, including any features that make the room easier to use.

Drywall mid-job: one wall hung, taped, and mudded, the adjoining walls still open studs with insulation, mud buckets on the slab.
On the jobDrywall mid-job: one wall hung, taped, and mudded, the adjoining walls still open studs with insulation, mud buckets on the slab. Illustrative project image.
Finished bath: oak vanity with a stone top and widespread chrome faucet, a frameless glass shower with white subway tile and a tiled niche, and a white hex tile floor.
The finishFinished bath: oak vanity with a stone top and widespread chrome faucet, a frameless glass shower with white subway tile and a tiled niche, and a white hex tile floor. Illustrative project image.

The work sequence

What to expect while we are in the house.

  1. Planning

    We confirm how the household uses the bath and settle the layout and main selections.

  2. Preparation

    Tile and fixtures are ordered, the work area is planned, and any approvals are requested.

  3. Construction

    Work follows the agreed order, including waterproofing checks and any required inspections.

  4. Completion

    We walk the finished bath with you, list any open items, and leave care information. The length of each stage depends on the bath.

Questions people ask

Before they call.

Ask about this kind of remodel

Tell us how your household uses this room today, and we will explain what the scope would cover. Questions about this remodel reach 3Fold Labs as a demo.