Skip house navigation

Services

Built-ins and finish carpentry

Built-ins and trim planned around what your household needs to store and where. Below is what the work covers and what it does not.

Finished walk-in closet: white built-ins with lit hanging rods, a bank of drawers with brass pulls, and open shelving for shoes.

What it includes

In the scope

  • Measure the space and identify storage requirements
  • Develop cabinet, shelving, trim, and door details
  • Coordinate materials, hardware, and finish samples
  • Confirm appliance clearances and installation access

What stays outside this work

Not in the scope

  • Pieces not drawn into the scope are priced separately before we build them.
  • Wiring, ducts, or wall repairs found during install are named and priced before they are added.

How this work is priced

Fixed labor. Named allowances. Change orders with a number.

  • Defined scope

    The proposal lists each piece included apart from options and upgrades, so you can see what the price covers.

  • Material selections

    Your wood, hardware, and finish choices, and any allowances, are recorded so the budget can be read piece by piece.

  • Approved changes

    Any change to a piece is written with its cost and timing before you approve it.

Choices you make, and when they are due

The decisions, in the order they come.

  1. Project priorities

    Tell us what each family member needs to store and where.

  2. Scope and selections

    Approve the drawings for cabinets, shelves, trim, and doors.

  3. Scheduling and access

    Choose wood, hardware, and finish from samples you have seen in your light.

Finished laundry room: front-load washer and dryer under a stone counter, cream cabinets, and two floating oak shelves beside a window.
A laundry roomFinished laundry room: front-load washer and dryer under a stone counter, cream cabinets, and two floating oak shelves beside a window. Illustrative project image.
Ivory mudroom cabinetry with a fitted oak bench and neatly aligned storage drawers.
The standardIvory mudroom cabinetry with a fitted oak bench and neatly aligned storage drawers. Illustrative project image.

The work sequence

What to expect while we are in the house.

  1. Planning

    We confirm what the household needs to store and settle the drawings and main selections.

  2. Preparation

    Materials are ordered, install access is planned, and any approvals are requested.

  3. Construction

    Pieces are built and installed in the agreed order, with inspections where required.

  4. Completion

    We check each piece with you, note any adjustments, and leave care information. Timing for each stage depends on the pieces you choose.

Questions people ask

Before they call.

Ask about this kind of remodel

Tell us how your household uses this room today, and we will explain what the scope would cover. Questions about this remodel reach 3Fold Labs as a demo.