Skip house navigation

Illustrative project

A kitchen designed around storage and gathering

An illustrative plan for a kitchen that holds more and still leaves room for everyone to gather.

All project examples Kitchen remodeling

Finished kitchen: white shaker perimeter cabinets, a white oak island with a stone top and three upholstered stools, brass pendants, and a wood range hood over a white tile backsplash.
FinishedFinished kitchen: white shaker perimeter cabinets, a white oak island with a stone top and three upholstered stools, brass pendants, and a wood range hood over a white tile backsplash. Illustrative project image.

The project brief

Project priorities

The family cooked, did homework, and ate in one kitchen that had too little storage and a crowded path to the sink.

We began with how the household used the room each day, then the budget and the house itself. These points show how that became a scope.

Decided early

Decisions before construction

  • Watch how the family cooks, stores food, sits, and moves through the room
  • Draw the cabinet and appliance layout around those habits
  • Pick counters, lighting, and fixtures that work together
  • Set up a temporary kitchen and a separate way in for the crew
Kitchen after demo: walls open to the studs, old plumbing stubs exposed on the window wall, a work light on a tripod, and the door sealed in plastic.
On the job, week oneKitchen after demo: walls open to the studs, old plumbing stubs exposed on the window wall, a work light on a tripod, and the door sealed in plastic. Illustrative project image.

What was protected

Protecting the occupied parts of the home

  • Seal the kitchen doorways and lay a covered path from the side entrance.
  • Keep a working sink, fridge, and microwave in another room while the kitchen is out.

What surprised us

Plumbing inside the window wall can turn out different from what the visible pipes suggest.

How it was handled

If so, we show you the pipes, explain the choices and their cost, and agree any change to the days without the kitchen before work goes on.

Every change order on our jobs has a number and a schedule effect on it before the work happens. That is the rule, not the exception.

Mitered waterfall countertop corner with the veining carried down the miter to the floor.
Look closerMitered waterfall countertop corner with the veining carried down the miter to the floor. Illustrative project image.

Completion criteria

Walking the finished rooms

  • Walk the kitchen with the family and check it against the agreed layout and selections.
  • List anything left to finish and explain how to care for the counters and cabinets.